8 Wastes of Lean – Interactive Training

8 Wastes of Lean - Interactive Training

1. Transportation Waste Simulation

Objective: Optimize the movement of documents between departments

Department A
Part 1
Part 2
Department B
Department C

2. Inventory Waste Simulation

Objective: Maintain optimal inventory levels

Current Stock
Item A (15 units) Item B (25 units) Item C (40 units)
Daily Demand

Average daily usage: 10 units per item

Adjust Inventory

3. Motion Waste Simulation

Objective: Optimize workspace layout to minimize unnecessary movement

👷
🔧
💻
Movement Log

4. Waiting Waste Simulation

Objective: Identify and eliminate waiting time in processes

Process Steps
Step 1: Data Entry (2 mins)
Step 2: Verification (3 mins)
Step 3: Approval (5 mins)
Process Statistics

5. Overproduction Waste Simulation

Objective: Match production with actual demand

Customer Orders
  • Product A: 10 units
  • Product B: 15 units
  • Product C: 5 units
Production Plan
Storage Costs

6. Over-processing Waste Simulation

Objective: Identify and eliminate unnecessary steps

Current Process Steps
Process Analysis

7. Defects Waste Simulation

Objective: Identify and prevent quality issues

Quality Check Station
Item #1: Pending Check
Item #2: Pending Check
Item #3: Pending Check
Quality Metrics

8. Skills Waste Simulation

Objective: Identify and utilize employee skills effectively

Employee Skills
Employee A
Programming Project Management
Employee B
Data Analysis Communication
Current Tasks
Task 1: Data Entry
Skills Analysis
Lean Manufacturing 8 Wastes

The 8 Wastes of Lean Manufacturing

Click on each waste type to explore detailed examples and solutions

⚠️
Defects

Products or services that don't meet specifications

Impact on Efficiency: 85%
📦
Overproduction

Producing more than needed or before it's needed

Impact on Efficiency: 75%
Waiting

Time spent waiting for the next step in the process

Impact on Efficiency: 85%
👥
Non_utilized_Talent

Underutilizing people's skills and creativity

Impact on Efficiency: 75%
🚛
Transportation

Unnecessary movement of materials or information

Impact on Efficiency: 85%
🏭
Inventory

Excess storage of parts, materials, or information

Impact on Efficiency: 75%
🔄
Motion

Unnecessary movement of people or equipment

Impact on Efficiency: 85%
⚙️
Extra_Processing

Doing more work than required by the customer

Impact on Efficiency: 75%

Common Examples:
    Solutions:
    Key Metrics
    Learning Progress
    8 Wastes of Lean Manufacturing

    8 Wastes of Lean Manufacturing

    Slide 1 of 8